Hydrolevel 724 Series Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Akcesoria do wody Hydrolevel 724 Series. Hydrolevel 724 Series User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 4
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
724 Series
Low Water Cut-Off
Feeder Combination
for Steam Boilers
24 VAC Operating Voltage
HOW TO INSTALL
83 Water Street New Haven, CT 06511 Phone (203) 776-0473 FAX (203) 773-1019 www.hydrolevel.com
No moving parts in water.
No floats to hang-up or foul.
Unique two probe design. Bouncing
water line wonʼt cause on-off burner
cycling or water valve slamming
noise.
Easy installation. Quick hook-up
fittings adapt control to all 8" to 14"
sight glasses.
Simple fast wiring. Can be used with
any standard automatic water feeder.
WARNING: Power must be off during installation or servicing of the control. Only qualified personnel may install or service the
control in accordance with local codes and ordinances. Read instructions completely before proceeding. Caution Disconnect power
supply before beginning installation to prevent electrical shock or equipment damage.
Remove gauge glass assembly and nipples replac-
ing nipples with two 6" brass nipples provided
.
Install 1/2" x 1/2" x 3/8" tee
on top nipple.
Install 1/2" x 2" brass nipple
and 1/2" x 1/2" x
1/2" tee
to 1/2" threaded hole in casting
.
Note: Casting is designed for either left or right
mounting on gauge glass. Be sure to plug hole on
opposite side.
Thread tee attached to casting into bottom 6" nip-
ple. Tighten until casting is vertical.
Install compression fittings
into casting and
top tee. Size copper tubing
and tighten
between the two compression fittings.
Attach control to probes using No. 8-32 self tap-
ping screws provided. Install blow down valve (by
others) in bottom 3/4" tapped hole. Be sure to
attach maintenance tag in prominent place near
valve.
Reattach gauge glass cocks and gauge glass into
end of 1/2" tees. Pressure-trol can be threaded
into 1/8" threaded hole on top of casting. If pres-
sure-trol is not used, plug 1/8" hole on top of
casting.
Attach blue probe lead wire to upper probe and
white probe lead wire to bottom probe with wing
nuts and lock washers provided.
(2) 6" x 1/2" brass nipples
(1) 1/2" x 1/2" x 3/8" tee
(1) 1/2" x 1/2" x 1/2" tee
(1) 2" x 1/2" brass nipple
(1) 711C manifold casting
(1) 3/8" copper tube
(2) 3/8" compression fittings
(1) 3/4" nipple (not included)
(1) Blow down valve
(not included)
1
2 34
5 67
Przeglądanie stron 0
1 2 3 4

Podsumowanie treści

Strona 1 - Feeder Combination

724 SeriesLow Water Cut-OffFeeder Combinationfor Steam Boilers24 VAC Operating VoltageHOW TO INSTALL83 Water Street • New Haven, CT 06511 • Phone (203

Strona 2 - WIRING METHOD B:

WIRING METHOD A:SAME POWER SOURCE FOR CONTROL AND BURNER CIRCUIT.WIRING METHOD B:SEPARATE POWER SOURCE FOR CONTROL AND BURNER CIRCUIT.ssA1Conn

Strona 3 - PRINCIPLE OF OPERATION

INSTALLATION & OPERATION OF FEEDEROPERATING INSTRUCTIONSA feed valve is supplied standard with controlmodel 724WF. It is recommended that a shut-o

Strona 4 - DIMENSIONS

MAINTENANCEDIMENSIONSSPECIFICATIONSMAXIMUM PRESSURE: 35 PSIINPUT VOLTAGE: 24 VAC, 60 HZSWITCH RATINGS: 5.8 FLA, 34.8 LRASWITCH CONTACTS: SPDTALARM CIR

Komentarze do niniejszej Instrukcji

Brak uwag